Built in layers, not dumped.
Gravel & Driveways
A driveway is a structure. Base, fabric, compaction, crown — in that order, every time.
Scope
What’s included.
Everything below is part of a standard install. If something on this list is not needed on your property, it comes off the quote.
- Layout and width set on site, including turnaround and apron
- Stripping of topsoil and unsuitable material
- Geotextile fabric to stop stone from pumping into subsoil
- Compacted process gravel base in lifts
- Crown shaped for surface drainage
- Top course gravel or crushed stone spread and rolled
- Edge restraint and transition at the road apron
- Final compaction and grading check
Method
How we do it.
01
Lay it out
We set width, length, and turnaround so the finished drive parks and plows properly.
02
Strip out
Topsoil and soft material come out. Building over them is why gravel drives rut.
03
Fabric and base
Geotextile goes down, then process gravel compacted in lifts. This is the load-bearing structure.
04
Crown and drain
The surface is crowned so water sheds to the edges instead of sitting in the middle.
05
Top course
Finish stone goes on and is rolled tight, with a clean apron at the road.
Materials & options
What we install.
Process gravel (#3 / #4)
Angular, load-bearing base that locks together under compaction.
Crusher run
Self-binding top course — the classic New England drive surface.
¾-inch bluestone
Cleaner, neater finish for higher-visibility drives.
Washed stone
Decorative edge and drainage applications.
Recycled asphalt
Cost-effective, compacts to a firm surface.
Good fit for
When to call us.
- New driveway from bare ground
- A drive that ruts, sinks, or washes out every spring
- Parking pads and equipment access
- Long rural drives where paving is not practical
Before & after
Same property, same angle.
Drag the handle to compare. This is the kind of difference proper preparation makes.


East Bridgewater
Foundation beds rebuilt and mulched


Scituate
Bed transformation and full mulch install


Westwood
Curb line rebuilt with crisp spade edges
FAQ
Straight answers.
Ready when you are
Let's talk gravel & driveways.
The site visit and estimate are free. Most projects are quoted within two business days.
